Illustrative Proof Demo

Inspect how claimed headroom becomes proof-adjusted capacity

Use a bounded Atlas-3 AI Campus scenario to walk from nominal headroom through constraints, candidate action checks, and an allow / repair / reject / no-proof trace.

Every accepted MW must point to a proof row. All sample values are illustrative until validated in a Capacity Audit.

Sales engineering inspection room

One scenario, four stakeholder lenses, four runtime assurance outcomes

The demo is ungated and illustrative. It shows how GridNinja should explain claimed headroom, binding constraints, candidate actions, and no-proof behavior before a site-specific deployment.

Scenario selector

Atlas-3 AI Campus

Synthetic illustrative scenario—not a customer or production result. It shows the artifact shape GridNinja would produce after a site-specific Capacity Audit.

Cursor-mode groundwork

Inspect reveals telemetry, margins, and binding constraints.

Evidence lens

Inspect evidence

Shows telemetry freshness, binding constraints, and margin to limit for the selected scenario.

telemetry

freshness, coverage, topology

constraint

active binding limit

output

proof row and margin

Candidate action

Shift 3.0 MW of training load for 45 minutes while preserving declared UPS reserve floor and thermal-water margin.Synthetic illustrative scenario—not a customer or production result.

Fresh telemetry within 15 seconds at all key nodesSynthetic illustrative scenario—not a customer or production result.

Contracted utility service: 120 MWSynthetic illustrative scenario—not a customer or production result.

RTA outcomes

Capacity Waterfall

Nominal headroom reduced to proof-adjusted capacity

Illustrative sample · evidence chain completeALLOW

illustrative

accepted headroom

5.8 MW

proof_root: 8f4c...91a

Observed nominal headroom

NO-PROOF
18.4 MW

The starting claim before proof. Illustrative Atlas-3 scenario.

inspect proof hint

capacity after: 18.4 MW

Electrical constraint

REPAIR
-3.7 MW

Feeders, transformers, PQ, and ramp behavior remove unsafe headroom.

inspect proof hint

capacity after: 14.7 MW

UPS/BESS reserve floor

REPAIR
-3.5 MW

Resilience reserve remains protected before flexibility is considered.

inspect proof hint

capacity after: 11.2 MW

Cooling and water margin

REPAIR
-2.3 MW

Thermal and water posture reduce usable AI capacity in constrained intervals.

inspect proof hint

capacity after: 8.9 MW

SLA/workload posture

REPAIR
-1.8 MW

Latency, immovable workloads, and tenant commitments stay inside policy.

inspect proof hint

capacity after: 7.1 MW

Telemetry trust discount

NO-PROOF
-1.3 MW

Stale or incomplete evidence becomes a no-proof discount.

inspect proof hint

capacity after: 5.8 MW

Proof-adjusted safe capacity

ALLOW
+5.8 MW

The illustrative accepted answer, not a guaranteed GridNinja outcome.

inspect proof hint

capacity after: 5.8 MW

Synthetic illustrative scenario—not a customer or production result.

Deterministic progress

Compiling event tape...

Checking telemetry trust...

Running solver verification...

Applying RTA policy...

Writing proof row...

T+00:03

verified

event tape compiled

4,921 ordered rows staged for replay

T+00:09

untrusted

untrusted telemetry isolated

rack group RG-17 held as dashed no-proof evidence

T+00:18

locked

proof root locked

same tape, topology, and policy produce 8f4c...91a

T+00:19

written

receipt written

edge-004921 recorded read-only

Selected trace

ALLOW

Candidate action inside dispatch envelope

Reserve floor, cooling margin, and workload policy remain inside declared limits.

+4.6 MW proof-adjusted capacitySynthetic illustrative scenario—not a customer or production result.

Runtime Assurance Theater

Propose an action. Watch GridNinja allow, repair, reject, or no-proof it.

The UI can explain a candidate. Authority remains with deterministic verification, runtime assurance, receipts, and replayable proof.

REPAIR

candidate action

Shift flexible AI training load

requested

2.4 MW

duration

14 min

target

Cluster B / UPS Group 2

Proposal
Solver
RTA
Receipt
Replay
Proof

rta output

UPS reserve floor would fall below operator policy, so the runtime assurance layer clips the action to a safer dispatch envelope.

accepted

1.1 MW

proof_row

rta_row_004921

mode

shadow_read_only

proposalsolverrtaproof

Proof story

Claimed headroom becomes an exportable proof chain

Step 01

Start with claimed headroom

NO-PROOF

The story begins with a capacity claim that has not yet earned operator trust.

artifact: Observed nominal headroom

nominal_headroom

18.4 MW illustrative

proof_posture

claim only

Step 02

Bind every active constraint

REPAIR

Power, cooling, reserve, workload, and telemetry trust each reduce unsupported headroom.

artifact: Constraint braid

binding

reserve floor + telemetry trust

capacity_after

5.8 MW illustrative

Step 03

Run the RTA decision

ALLOW

The runtime assurance layer allows, repairs, rejects, or returns no-proof before authority expands.

artifact: RTA trace

decision

ALLOW after repair

authority

solver + RTA gate

Step 04

Export the proof pack

ALLOW

Accepted capacity becomes an inspectable proof object, not a hidden dashboard claim.

artifact: Proof Pack

artifact

Load Passport + ledger + evidence packet

proof_root

8f4c...91a

AI Data Center Load Passport

A capacity identity operators, utilities, partners, and reviewers can inspect.

The Load Passport binds proof-adjusted capacity, ramp limits, reserve floors, telemetry trust, no-proof gaps, and accepted-headroom evidence into one inspectable record.

Illustrative sample · evidence chain complete

selected passport section

Site Identity

Telemetry boundary, site role, and declared operating policy.

telemetry

Site registry + read-only connector manifest

freshness

manifest sampled T-00:09

proof_row

Verified

lp.site_identity.row_001

envelope trend

proof pack export

site_identity.json
connector_manifest.json

FleetOS Time Travel

Fleet evidence without fleet-side actuation authority.

FleetOS aggregates signed site envelopes, proof roots, no-proof gaps, and accepted headroom. Local site authority remains bounded, operator-accepted, and proof-gated.

proof-adjusted fleet MW

16.2 MW

event phase

RTA Decision: Site envelopes apply local policy

no-proof sites excluded from aggregate

selected site evidence

ATL-1 / Shadow

Read-only proof collection with no write credentials.

accepted_mw

5.8 MW illustrative

no_proof_gaps

3

phase

RTA Decision

proof_root

8f4c...91a

Next step

Turn the illustrative inspection flow into a site-specific Capacity Audit

GridNinja starts with Shadow Mode evidence, proof objects, and operator review before any bounded autonomy is considered.