  "schemaVersion": "assessment.v1",
  "scenario": "b",
  "title": "A smaller commitment needs review",
  "datasetId": "demo-01-synthetic-v1",
  "modelVersion": "illustrative-assessment-1.0.0",
  "publication": {
    "id": "demo-01-b",
    "version": "1.0.0",
    "narrativeVersion": "1.0.0",
    "templateVersion": "1.0.0"
  },
  "provenance": "synthetic",
  "operationalAuthority": "none",
  "basis": {
    "id": "demo-01-meter-hour-20260922",
    "siteId": "DEMO-01",
    "meterBoundary": "Fictional facility electrical meter",
    "referenceLoadKW": 20000,
    "startUTC": "2026-09-22T00:00:00Z",
    "endUTC": "2026-09-22T01:00:00Z",
    "quantityBasis": "additional-to-reference"
  },
  "nominal": {
    "status": "known",
    "valueKW": 12000,
    "unit": "kW",
    "basisId": "demo-01-meter-hour-20260922"
  },
  "modeledEligible": {
    "status": "known",
    "valueKW": 5800,
    "unit": "kW",
    "basisId": "demo-01-meter-hour-20260922"
  },
  "operatorAccepted": {
    "status": "not-applicable",
    "reason": "No operator has accepted this synthetic result.",
    "basisId": "demo-01-meter-hour-20260922"
  },
  "observedDelivered": {
    "status": "not-applicable",
    "reason": "No workload was operated or measured for this example.",
    "basisId": "demo-01-meter-hour-20260922"
  },
  "requestedProfile": {
    "id": "demo-01-b-requested",
    "familyId": "demo-01-b-workload",
    "basisId": "demo-01-meter-hour-20260922",
    "label": "Requested workload",
    "incrementKW": 7000
  },
  "revisedProfile": {
    "id": "demo-01-b-revised",
    "familyId": "demo-01-b-workload",
    "basisId": "demo-01-meter-hour-20260922",
    "label": "Proposed reduced workload",
    "incrementKW": 5800
  },
  "minimumViableIncrementKW": null,
  "screeningOutcome": "REPAIR",
  "conclusion": "The proposed 7.0 MW increment exceeds the fixture’s modeled 5.8 MW increment. A reduced workload profile requires review.",
  "commercial": {
    "status": "requires-review",
    "question": "Would the reduced 5.8 MW profile still meet the service and commercial requirement?"
  },
  "economics": {
    "status": "unestimated",
    "reason": "No price, utilization, investment cost, or commercial service requirement has been assessed."
  },
  "reportAcceptance": {
    "status": "not-applicable",
    "reason": "This is an authored example, not an accepted customer report."
  },
  "reasons": [
    {
      "id": "request-exceeds",
      "label": "Request exceeds the modeled increment",
      "detail": "The proposed revision is 1.2 MW below the request. No minimum commercially viable workload is specified for this fixture."
    }
  ],
  "assumptions": [
    "Every MW quantity is additional load above a steady 20.0 MW reference at the same fictional facility meter.",
    "The authored assessment window is one hour; the example does not model ramp, rebound, or workload transitions.",
    "For A–C, the example assumes the listed evidence is sufficient for the stated modeled screen."
  ],
  "limitations": [
    "All inputs and results are synthetic. They are not measured customer results or a guarantee of recoverable capacity.",
    "The model screen provides no permission to operate equipment or commit capacity.",
    "Site validation, authorized data, operational review, and commercial review would be required for a real decision."
  ],
  "evidence": [
    {
      "id": "electrical",
      "label": "Electrical boundary",
      "status": "synthetic",
      "detail": "Authored nominal headroom and reference load; no connection to a live facility."
    },
    {
      "id": "cooling",
      "label": "Cooling constraint",
      "status": "synthetic",
      "detail": "Authored cooling margin for the fixed window; no physical feasibility validation."
    },
    {
      "id": "operating-reserve",
      "label": "Operating reserve and service conditions",
      "status": "synthetic",
      "detail": "Authored assumptions, not agreed operating envelopes or SLAs."
    }
  ],
  "attribution": [
    {
      "id": "electrical-reserve",
      "label": "Electrical reserve",
      "reductionKW": 2000
    },
    {
      "id": "cooling-margin",
      "label": "Cooling margin",
      "reductionKW": 1500
    },
    {
      "id": "service-reserve",
      "label": "Service reserve",
      "reductionKW": 1200
    },
    {
      "id": "evidence-margin",
      "label": "Evidence margin",
      "reductionKW": 1500
    }
  ],
  "investigationOptions": [
    {
      "id": "phase",
      "label": "Phase the workload",
      "status": "unassessed"
    },
    {
      "id": "reschedule",
      "label": "Assess another time window",
      "status": "unassessed"
    },
    {
      "id": "cooling-investment",
      "label": "Investigate cooling investment",
      "status": "unassessed"
    },
    {
      "id": "bridge-power",
      "label": "Investigate bridge power",
      "status": "unassessed"
    }
  ]
}