DEMO-01-B / v1.0.0
Synthetic exampleModel screen · REPAIR
A smaller commitment needs review
- Requested increment
- 7.0 MW
- Modeled eligible increment
- 5.8 MW
Additional to the 20.0 MW reference. 2026-09-22 · 00:00–01:00 UTC.
The proposed 7.0 MW increment exceeds the fixture’s modeled 5.8 MW increment. A reduced workload profile requires review.
Economics unestimated. Operator acceptance and delivered capacity: not applicable. No operational authority.