Scenario D · NO-PROOF · v1.0.0
Missing evidence prevents assessment
Missing cooling evidence prevents assessment of the 5.0 MW request. The modeled eligible increment is unknown; no favorable conclusion or revision is available.
All MW figures are additional load above a steady 20.0 MW reference. Authored UTC window: 2026-09-22T00:00:00Z to 2026-09-22T01:00:00Z.
Synthetic teaching scenario. No customer result or equipment-control authority.
| Nominal increment | 12.0 MW |
|---|---|
| Modeled eligible increment | Unknown |
| Requested workload | 5.0 MW |
| Proposed revised workload | No revision proposed |
| Operator-accepted / observed delivered | Not applicable / Not applicable |
Requested profile: demo-01-d-requested.
Revised profile: Not applicable.
Governing conditions
Cooling evidence missing: Neither nominal headroom nor a previous scenario can replace the missing cooling evidence.
Boundary, hour, operating reserve, cooling evidence, and workload requirements must be reviewed together.
Business decision still to resolve
Can authorized cooling evidence be obtained for the same facility boundary and time window?
Economics unestimated. No price, utilization, investment cost, or commercial service requirement has been assessed.
What this does not establish
Physical feasibility, commercial usefulness, customer report acceptance, operational capacity acceptance, and equipment authority require separate evidence and decisions.
Phasing, another time window, cooling investment, and bridge power are unassessed investigation options, not evaluated alternatives.