GRIDNINJA
SYNTHETIC DECISION BRIEF
Scenario C · REJECT · v1.0.0

No admissible revision under the stated minimum

The 7.0 MW request cannot fit the modeled 5.8 MW increment, and the stated 6.5 MW minimum prevents an admissible revision in this fixture.

DEMO-01 · Fictional facility electrical meter

All MW figures are additional load above a steady 20.0 MW reference. Authored UTC window: 2026-09-22T00:00:00Z to 2026-09-22T01:00:00Z.

Synthetic teaching scenario. No customer result or equipment-control authority.

One scope, one hour, distinct quantities
Nominal increment12.0 MW
Modeled eligible increment5.8 MW
Requested workload7.0 MW
Proposed revised workloadNo revision proposed
Operator-accepted / observed deliveredNot applicable / Not applicable

Requested profile: demo-01-c-requested.
Revised profile: Not applicable.

Governing conditions

Stated minimum exceeds the modeled increment: 6.5 MW is required for the workload in this fixture. A 5.8 MW revision would not satisfy that minimum.

Boundary, hour, operating reserve, cooling evidence, and workload requirements must be reviewed together.

Business decision still to resolve

Which assumption or investment option should be investigated before this capacity commitment is reconsidered?

Economics unestimated. No price, utilization, investment cost, or commercial service requirement has been assessed.

What this does not establish

Physical feasibility, commercial usefulness, customer report acceptance, operational capacity acceptance, and equipment authority require separate evidence and decisions.

Phasing, another time window, cooling investment, and bridge power are unassessed investigation options, not evaluated alternatives.